[Expand]General Information
[Collapse]WinForms Controls
  Prerequisites
 [Expand]What's Installed
 [Expand]Build an Application
 [Collapse]Controls and Libraries
  [Expand]Forms and User Controls
  [Expand]Messages, Notifications, and Dialogs
  [Expand]Editors and Simple Controls
  [Expand]Ribbon, Bars and Menu
  [Expand]Application UI Manager
  [Expand]Docking Library
  [Expand]Data Grid
  [Expand]Vertical Grid
  [Expand]Property Grid
  [Expand]Pivot Grid
  [Expand]Member Tables
  [Expand]Tree List
  [Collapse]Chart Control
   [Expand]Getting Started
   [Collapse]Fundamentals
    [Expand]Charting Basics
    [Expand]Professional Charting
    [Collapse]Series Views
     [Collapse]2D Series Views
      [Expand]Area Series Views
      [Expand]Bar Series Views
      [Expand]Financial Series Views
      [Collapse]Gantt Series Views
        Side-by-Side Gantt Chart
        Overlapped Gantt Chart
      [Expand]Pie and Donut Series Views
      [Expand]Point and Line Series Views
      [Expand]Radar Series Views
      [Expand]Polar Series Views
       Funnel Series View
       Swift Plot Series View
     [Expand]3D Series Views
      Series Views Compatibility
    [Expand]Chart Elements
   [Expand]Data Processing
   [Expand]Appearance Customization
   [Expand]End-User Features
   [Expand]Design-Time Features
   [Expand]Visual Elements
   [Expand]Examples
   [Expand]Additional Resources
  [Expand]Diagrams
  [Expand]Gauges
  [Expand]Map Control
  [Expand]Scheduler
  [Expand]Spreadsheet
  [Expand]Rich Text Editor
  [Expand]Spell Checker
  [Expand]Form Layout Managers
  [Expand]Navigation Controls
  [Expand]Printing-Exporting
  [Expand]PDF Viewer
   Reporting
  [Expand]Snap
  [Expand]TreeMap Control
  [Expand]Sunburst Control
 [Expand]Common Features
  Get More Help
 [Expand]API Reference
[Expand]ASP.NET Controls and MVC Extensions
[Expand]ASP.NET Bootstrap Controls
[Expand]ASP.NET Core Bootstrap Controls
[Expand]WPF Controls
[Expand]Xamarin Controls
[Expand]Windows 10 App Controls
[Expand]Office File API
[Expand]Reporting
[Expand]Report and Dashboard Server
[Expand]Dashboard
[Expand]eXpressApp Framework
[Expand]eXpress Persistent Objects
[Expand]CodeRush
[Expand]CodeRush Classic
[Expand]Cross-Platform Core Libraries
[Expand]Tools and Utilities
 End-User Documentation
View this topic on docs.devexpress.com (Learn more)

Side-by-Side Gantt Chart

Expanded Short Description

The Side-by-Side Gantt Chart is represented by the SideBySideGanttSeriesView object, which belongs to Gantt Series Views (also called Time or Timeline charts). This view displays horizontal bars along the time axis. Each bar represents a separate event with the start and end values, hence these charts are used to track different activities during the time frame (e.g. plan the use of various resources, review the project's completion in project management, etc.). This chart type is useful when it's necessary to show activity bars from different series one above another, to compare their duration.

Note

To learn how to exclude holidays and weekends from an axis scale, refer to Data Aggregation.

A Side-by-Side Gantt chart is shown in the following image.

Note that it's common for Gantt charts to show the date-time axis (axis of values) horizontally, hence the Gantt chart can't be rotated. This is the reason why the GanttDiagram.Rotated property for the GanttDiagram is hidden and unavailable.

Expanded Chart Type Characteristics

The table below lists the main characteristics of this chart type.

Feature Value
Series View type SideBySideGanttSeriesView
Diagram type 2D-GanttDiagram
Number of arguments per series point 1
Number of values per series point 2 date-time values (Start and End)
Note

For information on which chart types can be combined with the Side-by-Side Gantt Chart, refer to the Series Views Compatibility document.

Expanded Example

For a design time example on how to create a Gantt chart, refer to How to: Create a Gantt Chart with Task Links.

The following example demonstrates how to create a ChartControl with two series of the SideBySideGanttSeriesView type, and add this chart to a form at runtime. Before proceeding with this example, first create a Windows Forms Application in Visual Studio, and include all necessary assemblies to the References list of your project.

Then, add the following code to the Form.Load event handler.

Tip

A complete sample project is available in the DevExpress Code Examples database at http://www.devexpress.com/example=E1220.

Expanded See Also

Is this topic helpful?​​​​​​​